Home / Worldwide / United Kingdom
Building Regulations 2010 · BS EN 1992 · BS EN 1998

House plan software for the UK — in metres, to the Building Regulations

UK work is metric, and it answers to two separate systems: planning permission, which is about size and appearance, and Building Regulations approval, which is about how it is built. PLOTVA draws in metres and millimetres, names the Building Regulations 2010 and Approved Documents A–Q as its reference set, designs concrete to BS EN 1992 and seismic to BS EN 1998, and produces diagrams, elevations, sections and a native DWG. Offline, from $2.

Rear extension limits, in one table

The single most-searched UK house question is how far back you can build without a planning application. In England, for a house (not a flat or maisonette):

TypePermitted developmentWith prior approval
Single storey — terraced or semi-detached3 m beyond the original rear wallup to 6 m
Single storey — detached4 mup to 8 m
Maximum height (single storey)4 m, with eaves not above 3 m within 2 m of a boundarysame
Two storey3 m deep, and at least 7 m from the rear boundary, roof pitch matching the housenot available
Conservation area, Article 4 direction, listed buildingrestricted or removedthe 6 m / 8 m route is not available on Article 2(3) land

The prior-approval route is the Larger Home Extension / Neighbour Consultation Scheme — it has been a permanent part of permitted development since 30 May 2019, the council consults adjoining neighbours for 21 days, and a fee applies (around £250 in England in 2026, £0 in some circumstances — check your council). Wales and Scotland differ: Wales allows 4 m single storey on any house with no larger prior-approval option.

Planning, Building Regulations and Party Wall are three different things

1 · Planning permission

Whether you may build it at all: size, position, appearance, neighbour amenity. Permitted development removes the need for an application when you stay within the limits above. The local planning authority decides.

2 · Building Regulations

How it is built: structure, fire escape, drainage, ventilation, energy, access. Most work needs a Building Regulations application — full plans or a building notice — and the inspector signs it off.

3 · Party Wall etc. Act 1996

Notice to neighbours when work is within 3 m of their structure, within 6 m and deeper than their foundations, or on a party wall itself. Separate obligation, separate notices, separate timetable.

A drawing set that satisfies one of these does not satisfy the others. The software produces the accurate geometry and the structural numbers; the applications, the notices and the sign-offs are procedural, and they are yours or your professional's to file.

What it gives a UK project

Metres first

Millimetres on the drawing, square metres in the schedules, and an area table that also reads square feet for the estate-agent conversation.

Structure named, not hidden

Concrete to BS EN 1992 and seismic to BS EN 1998, with the parameters and the load combination printed on the sheet so a checking engineer can follow it.

Extension geometry done properly

Set the existing rear wall as the datum and the software dimension from it — which is exactly how the 3 m / 4 m test is measured: from the original rear wall, not from a later addition.

DWG for the architect

30 AIA layers, real units, blocks and dimensions, plus DXF AC1032 — it opens in AutoCAD, BricsCAD, DraftSight and the usual UK practice tools.

Questions people ask before buying

How deep can a single-storey rear extension be without planning permission?

In England, permitted development allows 3 m on a terraced or semi-detached house and 4 m on a detached house, up to 4 m high, measured from the original rear wall. The Larger Home Extension route — a prior-approval application with neighbour consultation — extends that to 6 m and 8 m respectively.

Is planning permission the same as Building Regulations approval?

No, and both are usually needed. Planning permission is about use, size and appearance; Building Regulations approval is about how it is built — structure, fire escape, drainage, energy, access. The Building Regulations 2010 with Approved Documents A to Q are the reference set this software names.

Does it work in metres?

Yes, metres and millimetres are the default for the UK profile, with areas printed in square metres and square feet.

When does the Party Wall etc. Act 1996 apply?

Usually when work is within 3 m of a neighbour's structure, or within 6 m and deeper than their foundations, or on a party structure itself. It is a notice obligation, separate from planning and Building Regulations.

Contact the owner

Tell me the plot — I will tell you what it costs

Send the plot size, the country and the rooms you want. You get a straight answer with the plan that fits, usually the same day. The button opens a ready-written e-mail — just add your details and send.

No phone number and no e-mail address is printed on this page — the contact button opens Gmail with the address already filled in, so it cannot be scraped.